(i)
Proposed date of commencement of generation
(ii)
Salient features of the project relating to
technical details of the Generator, Prime
Mover, Exciter, Automatic Voltage
Regulation, Protection, Interconnection with
Licensee (to be attached separately)
(iii)
Planned peak generation in MW
(iv)
Operating plant load factor
(v)
Peak requirement for captive use in MW
(vi)
Voltage at which interconnection with Grid
system is desired,
(vii)
Nearest supply point of interconnection with
the grid system
(viii)
Arrangements for synchronization, if
generating units are proposed to be run
parallel (ix) Estimated cost of proposed
interconnection
(x) If
CPP is proposed to be run only as a : standby,
what arrangements are proposed for
prevention of back feeding to licensee system
(xi) If
the capacity of the CPP is higher than the
contracted demand, please state the reason for such
additional requirement
(xii) Estimated cost including IDC
(xiii)
Cost per MW/KW of generating capacity
(xiv) Cost per unit of generation
a. First Year
b. Levelised
(xv)
Fixed cost per unit
Variable cost per unit