Wheeling of electrical power from captive power
plant of an industrial company to the other
industrial units within the same company or to
any all industrial units of its group companies
will be allowed on the following terms: |
| |
| |
|
|
Wheeling terms :
- recipient shall have to
maintain minimum contract demand
equivalent to power to be
wheeled. Any excess drawl of
power beyond contract demand
shall be charged as per
Board's/Licensee's applicable
tariff.
- No night hour tariff
concession shall be admissible
for power consumed/drawn from
the gird during night period
- No night hour tariff
concession shall be admissible
for power consumed/drawn from
the gird during night period
- Cost of new sub-stations,
augmenting existing
sub-stations/transmission
lines/strengthening of existing
lines etc. wherever needed for
power evacuation from the
captive power plant for wheeling
purposes shall be borne by the
owner of the captive power
plant.
- Minimum quantity of power to
be wheeled shall not be less
than 5% of the installed
capacity of the captive power
plant of 5 MW, whichever is
more, among the group companies
taken all together, subject to
the condition that supplying
company consumes at least 50% of
the generated power. If quantum
of wheeled power is less than
5MW wheeling charges payable
will be calculated on normative
basis as if 5MW power has been
wheeled.
- A) Industries which are
situated in compact and
contiguous areas and do not
require the support of GEB/
Licensee system for wheeling
purposes shall be allowed to
meet one another's requirements
from the CPP without any minimum
limit as specified herein above
subject to conditions laid down
under sanction granted under
section 28 of the Indian
Electricity Act, 1910.
B) The wheeling account shall be
settled at the end of every
calendar month in the following
manner
# For the period between 6.00 hours to 22.00 hours-Slot-I.
# For the period between 22.00 hours to 6.00 hours next day-Slot-II.
Energy wheeled should be
accounted separately for each
Slot without giving credit in
the other Slot. Any excess units
supplied, resulting in net
supply to Gujarat Electricity
Board are to be treated as
unintended flow and are not to
be accounted for.
- In case where captive power
plants deliver energy in excess
of the energy consumed by the
recipient unit's (after
accounting for the system loss),
GEB/licensee shall not be liable
to make payments towards such
excess energy supplied being
inadvertent flow when GEB/Licensee
does not require that same.
- Wheeling of power shall not
be allowed when system frequency
is 51 Hz and above.
- Load restrictions measures
shall not be applied on
recipient units for the power
wheeled from the captive power
plants.
- Normal wheeling of power
shall be at power factor as near
to unity as possible (within
band of 0.95 lag and lead). At
the same time whenever Gujarat
Electricity Board has asked for
supply of Net Power into Gujarat
Electricity Board's system from
captive power plant, adequate
amount of relative power will
have to be supplied by captive
power plant i.e. at power factor
of 0.8 lag or lower.
|
|
Wheeling charges : Recipient unit
shall pay to GEB/Licensees wheeling
charges at the rate of 13.5 paisa
per Kwh and at 21 paisa per Kwh for
power delivered at EHV and HV
respectively. These charges shall be
valid for the Financial Year 1998-99
and shall be subject to revision
from time to time. The wheeling
charges shall be worked out for
every year on the basis of Power
Grid corporation of India Ltd's
method adopted for calculation of
wheeling of central sector's poer to
GEB/ Western Region. |
|
| |
|
|
Purchases of surplus Power : |
| |
GEB, may at its option and depending upon the
system requirement, purchase surplus power from
the captive power plant. The rate for purchase
of such surplus power would depend on the fuel
being used and would be on fuel cost plus basis.
where fuel cost will be decided by GEB on
normative basis for each quarter for each type
of fuel and gross calorific value. This
normative prices would be decided on the basis
of National Oil Companies' Prices for fuels
meant for power generation & Fixed cost payment
of 30 paisa and 20 paisa per unit will be given
for peak and off peak hours respectively. The
fuel utilisation rates depending on fuel would
be calculated based on SHR of 1900 KCal/Kwh for
liquid/gaseous fuel and SHR of 2400 Kcal/Kwh for
solid fuel with auxiliary consumption of 3% and
9% respectively.
The technical arrangement/ evacuation system
needed to supply surplus power would be worked
out between Captive power plant unit and GEB/
Licensee mutually and the same will be
implemented ordinarily by or through the Company
putting up captive Power Plants as per GEB's
specifications.
|
|
Banking: |
| |
Banking of electrical power with GEB/Licensee
would not be permitted. |
| |
|
|
Standby Generating Sets : |
| |
Permission for Installation of standby
generating sets to work as additional source of
power would be permitted up to 2 (two) times the
consumers contract demand/contracted load with
GEB/ Licensee or demand equivalent to capacity
of its own regular source of power supply.
Additional source of power means generating
capacity available in additional to its own
regular source of power or that availed from GEB/Licensee. |
| |
|
|
Contract Demand : |
| |
The industries on commissioning of captive power
plants will be allowed to reduce their existing
contract demand up to a level of 25% of their
original contract demand (e.g. if the contract
demand is 1000KVA it can be reduced to any level
up to 250 KVA depending upon the need of the
consumer) when they intend to have parallel
operation with the Grid. However, no contract
demand would be necessary/ would be insisted
upon if the industry with the captive power
plant intends to operate on stand alone basis.
In case of new connections, the contract demand
for parallel operation may be fixed as per the
requirement of the consumer.
Drawal of power from the State Grid by the
industrial unit would be subjected to applicable
tariff of GEB/Licensee. |
| |
|
|
Fees and Charges : |
| |
- While granting the consent for
installation of Captive Power Plant, the
fees shall be charged as decided by GEB/Licensee.
- Parallel operation charges shall be
charged at the rate fixed by GEB/ Licensee
with the approval of the Govt.
|
|
All the adhoc arrangements allowed for wheeling
and reduction of contract demand shall be
regularized in accordance with the provisions
contained in this resolution. |
| |
|
|
The electricity Duty payable by industrial
undertakings on self generated consumption as
contemplated under Bombay electricity Duty act,
1958, will be as per the rates specified under
Schedule-II of the said act as amended from time
to time revised rates of Electricity duty will
be applicable to all cases of Captive
generation/ Consumption after completion of
period of exemption as per the provisions of
Bombay Electricity Duty Act, 1958. |
| |
|
|
The State Govt. may review this policy in future
in the light of actual experience gained so as
to effectively fulfill the objectives of State
Power Policy, 1995. |
| |
|
|
The Government Resolution Energy &
Petrochemicals Department's No. CPP-
1197?Gol-65>PP Cell dated 22.12.1997 is hereby
withdrawn. |
| |
|
|
This issues with the concurrence of the
industries & Mines department and Finance
department dated 9th September, 1998. |
| |
|
| |
By order and in the name of Governor of Gujarat. |
| |
|
| |
| |
(Sanjay Gupta)
Joint Secretary to Govt. of Gujarat
Energy & Petrochemicals Department |
|
| |
|
| |
|
| |
To , |
| |
The Secretary to H.E.to the Governor of Gujarat
(By Letter). |
| |
The Principle Secretary to Hon'ble Chief
Minister |
| |
The Personal Secretary to Leader of Opposition
Party, Gandhinagar. |
| |
The Personal Secretary to Hon'ble Minister
(Industries) |
| |
The Personal Secretary to Hon'ble Minister
(Finance) |
| |
The Personal Secretary to Hon'ble Minister of
State (Energy) |
| |
The Chief Secretary to the Government Of
Gujarat, Gadhinagar |
| |
The Additional Chief Secretary, Industries &
Mines Deptt. Gandhinagar. |
| |
The Chairman, Gujarat Electricity Board, Baroda. |
| |
The Member (Finance), Gujarat Electricity Board,
Baroda. |
| |
The Member (Technical), Gujarat Electricity
Board, Baroda. |
| |
The Commissioner of Electricity, Gandhinagar |
| |
The Industries Commissioner, Gandhinagar. |
| |
The Managing Director, The Ahmedabad Electricity
Company Ltd., Ahmedabad. |
| |
The Managing Director, Gujarat Power Corporation
Ltd., Ahmedabad. |
| |
The Managing Director, Gujarat Industries Power
Company Ltd., Ahmedabad. |
| |
The Managing Director, Gujarat Industries Power
Company Ltd., Baroda. |
| |
The Managing Director, The Surat Electricity
Company Ltd., Surat |
| |
The Select File. |